Executive team posing in dark C-suite office

$3M+ in Value Created Across PMO Transformations

See how MSE turns execution into measurable ROI in 90 days.

$3M+

Value Created

5X

Delivery Increase

38%

Faster Reporting

3X

PMO Throughput

Case Study: New PMO

Dark PMO meeting, polo leader, diverse team

New PMO: $2.1M in Immediate
Value Creation

A PE-Backed Company Increased Deployment by
5X While Saving $2.1M in Vendor Management
Costs

Industry

Telecom / PE-backed

Early Stage phase in the process of deploying major capital

Problem

No PMO, poor execution

2 Projects in progress with painful execution. No project management.

Solution

Built structured PMO

Created the PMO with structure, reporting and schedules.

Impact

$2.1M+ / 5X deployed

We moved faster than our competitors while savings money!

About

Our client is a Private Equity-based Telecommunication company that deploys fiber optics in east Texas. They have
a commitment of 30 million dedicated to building out their network and have been operating for 2 years.

Challenge

The company has no formal project management in place. Currently, the corporate development team works with
the construction & engineering teams to deploy their network. Vendors are paid with no verification; materials are
order based on gut feeling and go-live dates are wishful at best. The team needed operational leadership that
could accelerate deployment. “For 18 months we have been working on deployment to 3 neighborhoods and have only completed 1. We can not afford to keep going at this pace” – CEO

Solutions

1

Developed 2-year deployment plan

2

Negotiated 20% vendor reduction

3

Standardized vendors

4

Built execution cadence

5

Created Board Ready Reporting

Results

5X More Deployment in Less Time

$2.1M Cost Reduction

Improved Team Performance

Ready to start?

Case Study: Constraint to Capacity

A beautiful abstract art piece with blue and black textured patterns, creating a calming and mysterious atmosphere.

New PMO: 3X throughput WITHOUT hiring

Industry

Telecom / PE-backed

Second round of capital raising, to fund the next big rollouts.

Problem

Limited PMO & Budget

We had a junior team and limited capabilities, with a major projects ahead.

Solution

Upskilled PMO

Created training centered around current tools to maximize benefits.

Impact

$440K Saved

No New hires were needed during this phase of growth and buildout

About

Our client is a Private Equity-backed Internet Service Provider (ISP) based in Conroe, Texas, serving over 5,000 homes with 100% fiber optic connectivity. The PMO team consisted of two project managers, three project coordinators, and one project assistant.

Challenge

The board approved a major network expansion requiring a 3X increase in project delivery throughput. A proposed budget of $440K was allocated to hire additional PMO staff; however, the existing team was junior, and the Project Executive sought to ensure readiness before scaling. I was engaged to assess the team, provide targeted training, and implement process improvements

Solutions

1

Technical Training: Excel for Project Mangers

2

Technical Training: MS Project – Program Management

3

Technical Training: Power BI for Project Analyst

4

Built: Project Reporting Template

5

Built: MS Project Templates

6

Built: Power BI Dashboard

Results

3X More Throughput

$440K in saved Salaries

Efficiency Improved

Ready to start?

Case Study: Power BI

Sales and revenue overview dashboard showing total revenue, profit, units sold, order value, regional and product category data

The $974K Dashboard

Industry

Telecom / PE-backed

Third round of capital raising, to fund the next big rollouts.

Problem

Reporting Manual

Project leaders spend 3 days putting together a report to the board with unclear data.

Solution

Dashboard Built

Connected 3 sources of dates to bring Network Planning, Engineering and Construction into view.

Impact

$974K realized

Unlocked $846K in cost savings & added $128,000 in
revenue.

About

Our client is a Private Equity-based Internet Service Provider (ISP) in the greater Houston Areas of Texas, with over 85,000 homes that have access to this 100% Fiber Optic Network. During the time of implementation, only 13,000 homes had access to their network.

Challenge

The board for the ISP just committed $30 million in capital for the expansion of the ISP’s network and wanted predictive visibility into the cost, risk & go-live dates for all neighborhoods. The PMO was early in the maturity phase and were still working in serval scattered spreadsheets. The Vice President was weary of reporting time and the accuracy of data. “With the amount of capital on the line, the board need clear reporting that we pull within minutes, not days!” he says.

Solutions

1

Implemented a centralized PMO Tracking database

2

We then created a Power BI Dashboard

3

Trained Team on Power BI

4

Upgraded the PMO Report for Board distribution.

Results

Bulk Material Agreement savings of $846,000

Actionable Go-Live data enabling marketing to realize $128,000 more

38% reduction in reporting times across the PMO

Ready to start?

Case Study: Enterprise ERP

Excel spreadsheet exporting tasks to Microsoft Project with progress bar

Excel to Enterprise PMIS:
Driving $720K in Profit Growth

Industry

Construction

Client manages major projects.

Problem

Needed a ERP System

The COO wanted a PMIS that the team could learn easily.

Solution

MS Project

After research and deliberation we decided to standup MS Projects because it was already installed.

Impact

$720K in profit

1.5% increase in profits equating to $720K.

About

Our client is a private equity-backed construction management firm overseeing large-scale projects, including hotels, hospitals, and stadiums across Texas.

Challenge

Upon engagement, the firm managed the financial of their projects through there accounting system, and the execution of their projects through SharePoint & spreadsheets. The COO wanted to move to a Project Management Information System (PMIS) but did not have the time to research solutions and had a limited budget. He was also weary of the time needed to train this team on a new system.

Solutions

1

Implemented Microsoft Project

2

Designed standardized project templates

3

Developed reporting structures for cost, resources, risks, and timelines

4

Delivered targeted training sessions

Results

Average of 1.5% increase in profit margins across all projects

Instant visibility across all projects

Increased organizational leverage, enabling the hiring of junior PM staff

Ready to start?